Valuations to the additional services |
Form of the
works |
Price |
Standard the installation multi of the Split- system |
180-300
|
Standard the installation of the thermal curtain |
50-80
|
The
installation of the internal block of Split- system from 1.5
to 3.0 kW |
50
|
The
installation of the internal block of Split- system from 3.1
to 7.5 kW |
60
|
The
installation of the external block of Split- system from 1.5
to 3.0 kW |
50
|
The
installation of the external of the block of Split- system
from 3.1 to 7.5 kW |
60
|
Additional
of communication for Split system to 3.3 kW for 1 meter. |
15 |
Additional
of communication for Split system from 3.3 kW to 6.0 kW for 1
meter. |
20 |
Additional
of communication for Split system from 6.0 kW to 8.2 kW for 1
meter. |
25 |
Of
the service of mountain climber. (to 1 conditioner to 3.3 kW) |
50 |
Of
the service of mountain climber. (to 1 conditioner to 6.0
kW)
|
75 |
Of
the service of mountain climber. (to 1 conditioner to 12 kW) |
100 |
Of
the service of auto-tower (height to 3-4 floors) (for 5 it is
hour) |
100 |
Deepening
in the brick, for 1 meter. |
10 |
Deepening
in the concrete, for 1 meter. |
15 |
Deepening
in the reinforced concrete, for 1 meter. |
20 |
Additional
of duct of 60х60, for 1 meter. |
7 |
Additional
of duct of 20x20 of, for 1 meter. |
4 |
Additional
of duct of 15х15, for 1 meter. |
3 |
Additional
of electro-cable for the conditioner to 3.0 kW, for 1
meter. |
0,5 |
Additional
electro-cable for the conditioner from 3.0 kW to 7.0 kW, for 1
meter. |
1 |
Punching
additional opening under the basic route in the partition (to 30
cm) |
10 |
The
repeated departure of brigade in the limits MRAR
(Moscow
ring avto road ) |
10 |
The
installation of automaton into the panel of the electric power
supply |
10 |